AHS Compliance Consulting
Sign in to your portal
Your compliance tools, one secure login.
Protected access for AHS clients.
Welcome back, Karen
Your position across every project, at a glance.
Active projects
3
Actions overdue
3
Compliance signed off
—
Your projects
Engineering block refurbishment
CDM 2015 · Building Regs
Student centre extension
BSA · competence evidence outstanding
Roof replacement
CDM · 3 actions overdue
Projects
Engineering block refurbishment
Refurbishment · CDM 2015 · Building Regs Part 2A · notifiable
Duty holders (CDM 2015)
Client
Newcastle College Group
Principal designer
Honest Safety Ltd
Designer (architect)
Fineline Architectural
Principal contractor
Vest Construction
Contractor (M&E)
Coolair Services
Significant risks
Asbestos in pre-1999 fabric
Survey complete; licensed removal scheduled
Work at height — roof plant
Edge protection design pending
Temporary works — structural openings
Design check outstanding
Live services isolation
Permits to work in place
Open actions
Provide temporary works design check
Fineline Architectural · due 2 Jul
Confirm asbestos removal certificate
Vest Construction · due 8 Jul
Issue updated CPP for strip-out phase
Honest Safety Ltd · due 10 Jul
Update fire evacuation plan — phase 2
Vest Construction · due 15 Jul
Evidence on file
Pre-construction information
Issued 14 Apr
F10 notification
Submitted 22 Apr
Construction phase plan
Accepted 6 May
Health & safety file
Compiled at handover
Oversight
One view across every system on the project. Click any item to open it in the source.
Right first time
88%
Schedule (SPI)
0.96
Time to rectify
6 days
Latest deliverables
Structural calculations · rev C
Structural Aconex
Ventilation layout · rev B
Mechanical Viewpoint
Fire strategy · rev A
Fire Procore
Protected access for AHS clients.